Vasse Western Power Sub Station
The new Vasse depot is situated on 1.89 hectares and contains a multitude of facilities to enable Western Power to provide for their customers
Project Overview
The new Vasse depot is situated on 1.89 hectares and contains a multitude of facilities to enable Western Power to provide for their customers. We were engaged to fabricate, paint and install various structures including workshops, office, wash bays and canopies, a total of 200T of steel, excluding roof purlins.
Testimonials
Challis Builders
We are very satisfied with product/service and would definitely recommend to others. Over-all self managed works on-site with a good attitude from everyone from the office staff through to all guys on-site. It was a pleasure working with Hot Weld.
Perkins Builders
We are very satisfied with product/service and would definitely recommend to others. Great quality and installation services. Hot Weld present as a professional and reliable structural fabricator.
Matthew
The steel for my shed went together really well. Thanks for sorting that and cheers to the truck driver for doing a great job loading it all on and helping to get it off at my place.
Guidera O’Connor
We have been very satisfied with the product/service provided by Hot Weld and would definitely recommend them to others. We were most satisfied with the quality of the product and installation. We have had many positive experiences working with Hot Weld. They are always willing to assist with design input, being flexible with our shutdown windows and just overall great workmanship. We look forward to the next project.